Ride reliability data, rankings, and downtime reports for US theme parks. Updated every 5 minutes.
Est. 2025

US THEME PARK
HALL OF SHAME

Judge Roy Scream — Rope Drop

Judge Roy Scream

Six Flags Over Texas
Overview Reliability Breakdown Strategy Rope Drop
Rope Drop Reliability

How often does Judge Roy Scream open on time when the park opens? This is different from mid-day reliability: opening delays are typically caused by overnight maintenance, morning inspections, weather checks, or ride systems that need time to warm up. A ride can be perfectly reliable once running but still open late.

Based on 564 operating days of 5-minute monitoring.

23.6%
On Time
133 of 564 days
26.4%
Opened Late
149 days
50.0%
Never Opened
282 days
When It Opens Late

On the days Judge Roy Scream doesn't open on time, how long do you have to wait?

Typical delay (median) 100 min
75th percentile delay 150 min
Bad day delay (90th percentile) 240 min
Average delay 110 min
Weekday vs Weekend

Does this ride open more reliably on certain days?

Weekday on-time rate (Mon-Fri) 19.0%
Weekend on-time rate (Sat-Sun) 27.9%
What this data means for trip planning: If you're counting on Judge Roy Scream for your rope drop strategy, it opens on time 24% of mornings. This ride has significant opening reliability issues. Don't build your rope drop plan around it; have alternatives ready.
DATA SOURCE
Live data powered by ThemeParks.wiki Open-source API providing live wait times & ride status for 50+ parks worldwide
View the open-source project on GitHub